Site visit 19th June 2014

Snaps from HLF’s site visit, showing construction work in progress by Triton . Compare with the “before” pictures posted in April.

Coming soon….. fly-through of the space

The main public spaces: exploration/exhibition, searchroom, staff offices:

Exploration space looking towards repository
Exploration space looking towards repository
The searchroom and (by the windows) staff office
The searchroom and (by the windows) staff office
Looking back from the searchroom across the main exploration space
Looking back from the searchroom across the main exploration space
The searchroom
The searchroom
The Big Curvy Screen in the group space
The Big Curvy Screen in the group space

 

Behind the scenes:

Staff break-out room
Staff break-out room
The main repository
The main repository
Double-skinned reinforced wall of the repositories The double skin allows for 4hr fire resistance; the metal braces are to withstand the pressure should the gas fire suppression system be activated
Double-skinned reinforced wall of the repositories
The double skin allows for 4hr fire resistance; the metal braces are to withstand the pressure should the gas fire suppression system be activated
Looking into the repository spaces from the document workroom
Looking into the repository spaces from the document workroom
Looking into a repository from the exploration space
Looking into a repository from the exploration space
Your intrepid reporter
Your intrepid reporter
This entry was posted in News.

Leave a Reply

Your email address will not be published. Required fields are marked *